We raise the debt facility,
you earn the asset.
By uniting Project Finance Advisory, Engineering, Programme and Construction Management with Super Intelligence-driven tools, ICONIC Raise & Build acts as your singular capital project partner.
We reinvent project delivery with one accountable team, standing by your side from the first strategic decision to the day your asset goes live.
Discuss a mandateICONIC Project Finance meets Raise & Build
You have to close the financing before you break ground. ICONIC has done that since 1987; Raise & Build now stays on from the first excavation to the last certificate, until the asset reaches the height the lenders paid for.
Every project has its breaking point. It sits between the builder and the bank.
If the concrete fails, the building fails. If the debt fails, the project does. Yet the works and the financing are still run by different firms, reporting to different masters, on different clocks.
Raise & Build stands on the line where they meet. Every construction decision is tested against cash flow and covenants before it turns into a claim, a default or a refinancing no lender will sign.
DatumOpen the figures
megaprojects run over budget.1
of construction projects came within 10% of budget over three years.2
over budget and 20 months late: the average capital project at completion.3

In project finance since 1987.
When you build a bridge, you build it to withstand the worst. We build every financing the same way.
We read the contract as the lender will
Every risk in the EPC, O&M or concession contract is tested for its effect on the financing before signature.
One mandate from funding route to refinancing
The same firm that structures the financing manages its delivery and its exit.
Claims measured in DSCR, not only in days
Delay and cost are reported in cash-flow and covenant terms the lenders act on.
A published method
Checklists, protocols and report formats you can test before you hire us.
More than one role, with Chinese walls
Separate teams, information barriers and your written consent.
Every asset tells the story of the deal behind it.

Boubyan Island Development
A port, a city for 70,000 people, industry, aquaculture and an airport on an island of tidal flats, phased from 2013 to 2039 and funded by the state, private investors and public-private partnerships.
ICONIC’s role: IPFA secondment to the programme management team for the Mega Projects Sector, Ministry of Public Works (listed in IPFA’s infrastructure assignments as “Bubiyan and Failaka Islands Development”).

Abu Dhabi International Airport
Assignment served through an IPFA secondment to the client’s project team.
Project name
To be supplied.
Project name
To be supplied.
Project name
To be supplied.
“When we build, let us think that we build for ever.”
No asset is built in a day. We check the bricks, and the money behind them, at every drawdown.
Secure the foundation before the storm hits.
Five stages, from the funding route to the refinancing. At each one: where it breaks, what we build and what we raise.
1Initiating the project and its funding route
The delivery model is chosen before anyone asks whether lenders will fund it.
Project definition, feasibility, delivery model (EPC, DBO, B(O)OT, PPP).
Funding route and bankability test; sponsors, lenders and investors.
of oil and gas megaprojects exceeded budget.4
2Planning contracts, cost and capital together
Contracts are drafted for the works and read for the financing too late.
Contract strategy and FIDIC book, tender documents, baseline cost and schedule, Monte Carlo risk.
Bankability of EPC, O&M and concession contracts; technical inputs to the model; lenders' due diligence to close.
cause of disputes: errors or omissions in contract documents (tied).5
3Executing the works, drawing funds against progress
Money is drawn against progress no one has tested commercially.
Owner-side contract administration; contractors and consultants.
Funds flow; drawdowns matched to certified progress.
of projects came within 10% of their original deadline.2
4Monitoring cost, time and the debt they carry
Claims reach the lenders after they have reached the cash flow.
Cost and schedule control, variations, claims and delay analysis, recovery.
Lenders' technical adviser and independent engineer; drawdown certification; effect on DSCR and covenants.
average construction dispute, 12.5 months to resolve (North America, 2024).5
5Closing out construction, opening the refinancing
Completion is certified for the works but not prepared for the refinancing.
Commissioning, completion tests, handover, final account.
Completion certificate for lenders; refinancing or sale.
average recovery on construction-phase defaults, against 81.2% in operation.6
Built to connect.
Transport, power, ports and water: the networks ICONIC has financed and advised on.
Transport and civic infrastructure
Metro, airports, roads, logistics.
On ipfa.finance: São Paulo Metro Line 4; Penang International Airport expansion; Transport and flood control, Vietnam; Three Gorges modern logistics centre.
Infrastructure and urban development
Rail and transit

Bridges, tunnels and roads
Clients served through IPFA secondments to their project teams include (assignments in the index below):
- European Agency for Reconstruction
- Eurotunnel
- Government of Papua New Guinea
- Jebel Ali Properties
Airports

Hospitals and healthcare
Apartments and housing
High-rise buildings

- Join Engineering Consultants
- Qatar Navigation
- Nakheel Corporation
- Daman Real Estate Capital Partners Ltd.
- United Nations
Energy and power
Solar, wind, gas to power, tidal.
On ipfa.finance: Noor Ouarzazate; Sainshand wind farm, Mongolia; KivuWatt; Marine Current Turbines and Atlantis Resources.
Ports, shipping and LNG infrastructure
Shipyards, vessels, FSRUs and terminals.
On ipfa.finance: Hudong-Zhonghua and Shanghai shipyards; two sister LNG vessels; the FSRU transactions of the LNG page.
Build something that outlives the loan.
Tell us where your project stands. A director replies.
- B. Flyvbjerg, "What You Should Know about Megaprojects and Why", Project Management Journal, Vol. 45 No. 2, 2014.
- KPMG International, "Climbing the Curve: 2015 Global Construction Project Owner's Survey", April 2015.
- McKinsey & Company, S. Fuchs, J. Nowicke, G. Strube, "Navigating the digital future: The disruption of capital projects", October 2017.
- EY, "Spotlight on oil and gas megaprojects", August 2014 (365 megaprojects).
- Arcadis, 15th Annual Construction Disputes Report, North America, 2025 (2024 data).
- Moody's, "Default and Recovery Rates for Project Finance Bank Loans, 1983–2015", March 2017.