ICONIC Project Finance Advisory logo ICONIC
Project Finance Advisory

Upstream oil and gas advisory: what sets the borrowing base, and what protects it

Coloured rock layers against a deep blue sky

In brief

  • An upstream producer’s bank line is sized on the discounted value of its proved reserves at the banks’ own price deck, weighted by how certain each category of reserve is, and resized twice a year. In the method described by Columbia’s Center on Global Energy Policy, producing reserves count at 95–99% of their value and undeveloped reserves at well under half.
  • A cut in the price deck reaches the borrowing base with leverage, because costs do not fall with prices. In ICONIC’s worked case, a 25% cut leaves a producer drawn at 330 on a base of 401 with a deficiency of about 89 to repay; hedging 85% of producing volumes removes it.
  • The redetermination changes how producers behave. In a study of 69 US producers, highly leveraged firms brought wells into production just before their loans were renegotiated, at a long-run cost of about 4.8% of project value.

Chapter 1

What happens to the debt when the oil price falls?

When prices fall, the reserves are worth less, the borrowing base falls and the producer may have to repay part of its line at the worst moment.

ICONIC Project Finance Advisory works on the financing side of energy projects. In upstream oil and gas, much of that financing does not follow the project model of a fixed loan against a fixed set of contracts. It takes the form of reserve-based lending: a revolving bank line whose limit, the borrowing base, is set by the value of the producer’s reserves and reset at regular intervals.

Download the PDF

That design makes the debt move with the oil price. When prices fall, the reserves are worth less, the borrowing base falls and the producer may have to repay part of its line at the worst moment. When the fall is broad, the effect spreads across the sector.

The Bank for International Settlements described how this happened after 2014 (Domanski et al., 2015).

  • The scale of the debt. The total debt of the oil and gas sector reached roughly US$2.5trn in 2014, about two and a half times its end-2006 level. Bonds outstanding rose from US$455bn in 2006 to US$1.4trn in 2014, and syndicated loans to the sector in 2014 amounted to an estimated US$1.6trn.
  • The price of risk. High-yield energy spreads widened from a low of 330 basis points in June 2014 to over 800 basis points in February 2015.
  • The feedback. Indebted producers may keep output high and sell forward to service their debt, which adds supply and pushes prices down further.

What does the research say about hedging and leverage?

Two strands of research bear directly on a producer’s bank line.

  • Hedging lowers risk, not necessarily value. Jin and Jorion (2006) studied 119 US oil and gas producers from 1998 to 2001. Hedging reduced the sensitivity of their share prices to oil and gas prices, but did not raise firm value.
  • Leverage changes operating decisions. Gilje, Loutskina and Murphy (2020) followed the wells of 69 US producers and found that the most leveraged ones changed when they brought wells into production around their loan renegotiations. Their results are the subject of Test 3.

The two findings fit together for a lender. Hedging may not create value for shareholders, but it protects the collateral, and that is why lenders ask for it.

Topics to consider at this stage

  • How much of the producer’s debt is reset with its reserves, and how often?
  • What happens to its liquidity if the borrowing base falls by a quarter at the next redetermination?

That design makes the debt move with the oil price.

Inside the paper

Upstream oil and gas advisory: what sets the borrowing base, and what protects it

DOC IPFA-INS-PF-PFT-2611-IPF-027-V1

Fill out the form to read the full paper.

PDF edition

Download the full Insight

Register below. We will ask you to confirm your e-mail address and then send you a personal download link.

Chapter 2

Test 1. How is the borrowing base built?

The borrowing base rewards production, not reserves in the ground.

The framework asks three questions about a reserve-based line:

  • how the borrowing base is built;
  • what a cut in the price deck does to it, and how much hedging protects it;
  • how the redetermination changes the producer’s own decisions.

The first follows the method described by Azar (2017), a policy report. The second is ICONIC’s arithmetic on that method. The third rests on the peer-reviewed model of Gilje, Loutskina and Murphy (2020).

Azar (2017) describes the method banks use. The borrowing base is the net present value of future cash flows from the reserves, discounted at 9% (PV9) on the banks’ price deck, with each category of reserve counted at an advance rate that reflects its risk:

Formula 1 (after Azar, 2017)

BB=∑kARk·PV9k(P),k∈{PDP, PDNP, PUD}

where:

  • BB is the borrowing base, the limit of the bank line;
  • PV9ₖ(P) is the present value at 9% of the cash flows from reserve category k at the price deck P;
  • ARₖ is the advance rate for category k, one minus its risk factor;
  • PDP are proved developed producing reserves, PDNP proved developed non-producing and PUD proved undeveloped.
CategoryWhat it isAdvance rate
PDPProved reserves from wells already producing95–99%
PDNPProved reserves from wells drilled but not yet producing65–75%
PUDProved reserves that still need wells to be drilledRisk factor of 50–60%, so 40–50%
Probable and possibleNot yet provedNo credit
Exhibit 1. How reserve categories count towards the borrowing base. Reading note: a barrel already flowing counts almost in full; a barrel that still needs a well counts at less than half. Source: Azar (2017), pp. 14–15. The price deck typically tracks NYMEX futures with discounts; banks also run a stressed case below the futures curve. Redetermination is generally semi-annual.

What it means for the producer. The borrowing base rewards production, not reserves in the ground. A producer that needs to borrow against undeveloped acreage will find its line small until the wells are drilled, and will feel the pull to drill them before the next redetermination.

Limits.

  • Azar (2017) is a policy report, not a peer-reviewed study, and describes US practice.
  • Advance rates and price decks vary by bank and are set at the independent engineer’s discretion within each bank’s risk policy.

Topics to consider at this stage

  • What share of the reserve value is in producing wells, and what share still needs drilling?
  • How far below the futures curve is the banks’ price deck, and how is the stressed case set?

Producing reserves

95–99%

The advance rate on reserves from wells already producing. Source: Azar (2017).

Chapter 3

Test 2. What does a cut in the price deck do, and how much does hedging protect?

When the price deck falls, the value of the reserves falls by more, because operating and development costs do not fall with the price.

When the price deck falls, the value of the reserves falls by more, because operating and development costs do not fall with the price. A hedge at or above the old deck keeps the value of the hedged volumes. Jin and Jorion (2006) show that hedging lowers producers’ sensitivity to commodity prices. For the borrowing base, that means less of a cut at the next redetermination.

The model (ICONIC’s arithmetic on Formula 1). Let the price deck fall by a share Δ, and let ε be the elasticity of reserve value to price. If a share η of producing volumes is hedged at the old deck:

Formula 2 (ICONIC)

PV9k(P′)≈PV9k(P)·[1−ε·Δ·(1−ηk)],Deficiency=max(0, L−BB′)

where L is the amount drawn, BB′ the borrowing base after the cut, and ηₖ the share of category k’s volumes hedged (applied here to producing reserves only).

A worked case (ICONIC’s own illustration). A producer’s reserves are worth, at PV9 on the current deck, 300 in producing wells, 80 in drilled but non-producing wells and 120 in undeveloped acreage. At advance rates of 97%, 70% and 45%, its borrowing base is 401. It has drawn 330. The deck is cut by 25%, and reserve value falls 1.6 times as fast as the price.

Share of producing volumes hedgedBorrowing base after the cutDeficiency to repay (drawn 330)
None24189
50%29931
85%340None
Exhibit 2. Borrowing base after a 25% cut in the price deck. (ICONIC calculation from Formulas 1 and 2) Reading note: the unhedged producer must find about a quarter of its drawn line at the moment prices have fallen. Hedging most of its producing volume keeps the line intact. Source: ICONIC analysis. Values in any currency unit; the elasticity of 1.6 and the reserve values are assumptions for illustration. Azar (2017) notes that lenders typically limit hedges to 80–90% of anticipated production from producing reserves.
Figure 1. Borrowing base after a 25% cut in the price deckHorizontal bar chart of the borrowing base after a 25 per cent cut in the price deck, against an amount drawn of 330: no hedge, 241, a deficiency of 89; 50 per cent of producing volumes hedged, 299, a deficiency of 31; 85 per cent hedged, 340, no deficiency.No hedge241 (deficiency 89)50% hedged299 (deficiency 31)85% hedged340 (no deficiency)0100200300400Borrowing base after a 25% cut in the price deck (currency units)Drawn: 330
Figure 1. Borrowing base after a 25% cut in the price deck. Reading note: the values of Exhibit 2; the dashed line is the amount drawn. Source: ICONIC calculation from Formulas 1 and 2.

What it means for the producer. The hedge programme is part of the debt structure. It should be sized against the borrowing base the producer cannot afford to lose, not only against its budget.

Limits.

  • The hedges are assumed fully effective and the counterparties sound.
  • Production and costs are held constant between redeterminations.

Topics to consider at this stage

  • How large a deficiency would the next redetermination create at a deck 25% lower, and where would the cash come from?
  • What share of producing volumes is hedged, at what prices, and for how long against the tenor of the line?

The hedge programme is part of the debt structure.

Unhedged, after a 25% cut

89 of 330

The deficiency the producer must repay. ICONIC worked case.

Chapter 4

Test 3. How does the redetermination change the way producers drill?

A borrowing base reset twice a year can make the debt, not the reservoir, set the drilling plan.

Gilje, Loutskina and Murphy (2020) study what highly leveraged producers do around their loan renegotiations. They track 3,573 wells spudded by 69 public US producers in autumn 2014 and use an event study around each firm’s renegotiation month:

Formula 3 (Gilje, Loutskina and Murphy, 2017 working paper version of the 2020 article)

WellStartijt=∑mαmRenegMonthm+∑mβm(RenegMonthm×HighLevi)+Firm FE+Geography FE+Month FE+εijt,m=−3…3

where:

  • WellStartᵢⱼₜ is 1 if well j of firm i begins producing in month t;
  • RenegMonthₘ is 1 if month t is m months from the firm’s loan renegotiation;
  • HighLevᵢ is 1 for the most leveraged firms;
  • βₘ measures how much more the leveraged firms start wells in month m.
FindingValue
Wells brought into production one month before renegotiation, highly leveraged firms21% of their autumn-2014 wells, falling to 8% in the month after
More wells completed in the month before than in the month after renegotiation145% more for highly leveraged firms, 63% for others
Output of wells completed before renegotiation417 barrels a day on average, against 292 for those completed after
Estimated gain in collateral from early completionAbout 6.9%
Long-run cost of completing early when futures prices were risingAbout 4.8% of project value
Exhibit 3. What leveraged producers did around their renegotiations. Reading note: leveraged producers brought their best wells forward to raise their borrowing base at renegotiation, and gave up long-run value to do it. Source: Gilje, Loutskina and Murphy (2017 working paper; published 2020), Tables 2, 6, 7, 9 and 10 and text.
Figure 2. Wells brought into production around renegotiation, highly leveraged firmsHorizontal bar chart of the share of highly leveraged firms’ autumn-2014 wells brought into production: 21 per cent one month before the loan renegotiation, 8 per cent one month after.One month before renegotiation21%One month after renegotiation8%0510152025Share of autumn-2014 wells brought into production, %
Figure 2. Wells brought into production around renegotiation, highly leveraged firms. Reading note: the first row of Exhibit 3. Source: Gilje, Loutskina and Murphy (2017 working paper; published 2020).

What it means for the producer. A borrowing base reset twice a year can make the debt, not the reservoir, set the drilling plan. A producer with headroom can drill for value; one without it drills for the redetermination. The structure of the line is therefore an operating decision as much as a financing one.

Limits.

  • The figures are from the 2017 working paper; the published 2020 article may differ in detail.
  • The study covers US shale in a single period of falling prices.

Topics to consider at this stage

  • Is the drilling plan being set by the reservoir and the price outlook, or by the next redetermination date?
  • Would a longer redetermination cycle, more hedging or a different form of debt give the producer room to drill for value?

Long-run cost

4.8%

Of project value, from completing wells early. Source: Gilje, Loutskina and Murphy.

Chapter 5

Framework: what should a producer compute before the next redetermination?

All four can be computed before the banks do it at the next redetermination.

QuestionNumber to computeTest
How much of the base rests on producing reserves?Share of BB from PDPTest 1
What does a 25% cut in the deck do?Borrowing base after the cut and deficiencyTest 2
How much does the hedge book protect?Deficiency with and without hedgesTest 2
Is the debt setting the drilling plan?Wells timed to the redetermination rather than the reservoirTest 3
Exhibit 4. The borrowing base test: four numbers before the next redetermination. Reading note: all four can be computed before the banks do it at the next redetermination. Source: ICONIC analysis, drawing on Azar (2017), Jin and Jorion (2006) and Gilje, Loutskina and Murphy (2020).

Chapter 6

What’s the bottom line?

A reserve-based line is debt that moves with the oil price.

A reserve-based line is debt that moves with the oil price. It is sized on producing reserves at the banks’ deck and resized twice a year, so a price fall reaches the producer’s liquidity within months, with leverage. Hedging protects the borrowing base even where it does not create value for shareholders, and the evidence shows that without headroom, the redetermination starts to drive operating decisions.

For an upstream producer, this leads to three steps:

  1. Compute the borrowing base on a stressed deck before the banks do, and know the deficiency it would create.
  2. Size the hedge book against the borrowing base the producer cannot afford to lose.
  3. Keep enough headroom, or choose a form of debt, that lets the reservoir rather than the redetermination set the drilling plan.

The structure of the line is therefore both a financing and an operating decision.

How ICONIC can help

ICONIC works on upstream financing from the lenders’ side, before the next redetermination.

Summary

The oil and gas sector carried roughly US$2.5trn of debt in 2014, and high-yield energy spreads more than doubled when prices fell (Domanski et al., 2015). Much upstream debt is a reserve-based line, sized on the PV9 of proved reserves at the banks’ deck, with producing reserves counted at 95–99% and undeveloped reserves at under half, and resized twice a year (Azar, 2017). In ICONIC’s worked case, a 25% cut in the deck creates a deficiency of about a quarter of the drawn line, which a hedge on 85% of producing volumes removes. Jin and Jorion (2006) show that hedging lowers price sensitivity without raising firm value, and Gilje, Loutskina and Murphy (2020) show that highly leveraged producers time their wells to their renegotiations at a cost of about 4.8% of project value. The structure of the line is therefore both a financing and an operating decision.

Frequently asked questions

Why do undeveloped reserves count for so little?

Because they still need capital and time to produce, and the banks lend against cash flow they can see. In the method Azar (2017) describes, undeveloped reserves carry a risk factor of 50–60%, while producing reserves count almost in full.

If hedging does not raise firm value, why do lenders ask for it?

Because it protects their collateral. Jin and Jorion (2006) found no gain in firm value from hedging, but a lower sensitivity to prices. For a borrowing base reset on the price deck, lower sensitivity means smaller cuts.

Is reserve-based lending the only option for a producer?

No. A field development with long-term sales contracts can sometimes carry project debt, and larger producers can borrow on their corporate balance sheet. Each option changes how a price fall reaches the producer’s liquidity.

References

This Insight is for general information only and does not constitute investment, legal or tax advice. Figures from public sources are as reported at the dates shown.

About this article

Authors

ICONIC Energy TeamEnergy, ICONIC Project Finance AdvisoryPower bought from a plant not yet built is a promise in steel and cable. We test every link between the panels and the buyer before you sign: the PPA, the grid, curtailment and the financing.ICONIC Energy TeamPower bought from a plant not yet built is a promise in steel and cable. We test every link between the panels and the buyer before you sign: the PPA, the grid, curtailment and the financing.
ICONIC LNG & Gas Infrastructure TeamLNG & Gas Infrastructure, ICONIC Project Finance AdvisoryA floating terminal is only as good as the charter that keeps it moored. We read that contract first, measure the debt it can carry, and set up the purchase to outlast it.ICONIC LNG & Gas Infrastructure TeamA floating terminal is only as good as the charter that keeps it moored. We read that contract first, measure the debt it can carry, and set up the purchase to outlast it.

Approved by

Georgos S. AndrianopoulosCFO & Family Office Project Finance InvestmentProfessional EUR-ING by academic training and Chartered Financial Analyst, Georgos turned a long CFO career into international project, shipping and corporate finance. A motorsport enthusiast and car aficionado, he brings the same discipline to every transaction: precise set-up, rigorous modelling and timing at financial close, across maritime, infrastructure, oil and gas, renewables and PPPs. He tunes each transaction like a race car.Georgos S. AndrianopoulosProfessional EUR-ING by academic training and Chartered Financial Analyst, Georgos turned a long CFO career into international project, shipping and corporate finance. A motorsport enthusiast and car aficionado, he brings the same discipline to every transaction: precise set-up, rigorous modelling and timing at financial close, across maritime, infrastructure, oil and gas, renewables and PPPs. He tunes each transaction like a race car.

Related insights