ipfa.finance / services / tenor
Tenor.
Project and ship financeFunding the years the contract does not cover. The tenor gap: the debt runs longer than the contracts behind it.
The services that close the tenor gap
Project finance transactions
Full scopeShip project financing
Full scopeShip financing and capital raising
Full scopeIn the sectors: Float · Shipping & OffshoreBuild · InfrastructurePower · EnergyConnect · Telecoms & Digital InfrastructureHost · Hotels, Real Estate & Construction
Transactions
Each entry names the gap it closed.
Transaction details are for registered readers. Sign in to request access. IPFA reviews every request.
| No. | Size | Transaction | Gap |
|---|---|---|---|
| G1-01 | Locked | Power · PPP Locked | G1 tenorG4 public |
| G1-02 | Locked | Shipping finance · China Locked | G1 tenorG2 credit |
| G1-03 | Locked | Shipping finance · China Locked | G1 tenorG2 credit |
| G1-04 | Locked | Infrastructure · China Locked | G1 tenorG2 credit |
| G1-05 | Locked | Shipping finance · Japan Locked | G1 tenor |
| G1-06 | Locked | Shipping finance · Credit facility Locked | G1 tenor |
| G1-07 | Locked | Transportation · Malaysia Locked | G1 tenorG2 credit |
| G1-08 | Locked | Healthcare · Saudi Arabia | G1 tenorG4 public |
| G1-09 | Locked | Healthcare · Saudi Arabia | G1 tenorG4 public |
| G1-10 | Locked | Transportation · Georgia | G1 tenor |
| G1-11 | Locked | Power · Italy | G1 tenor |
| G1-12 | Locked | Shipping finance · China | G1 tenor |
| G1-13 | Locked | Shipping finance · Taiwan | G1 tenor |
| G1-14 | Locked | Solar power · Morocco Locked | G1 tenorG5 proof |
| G1-15 | Locked | Gas to power · Rwanda Locked | G1 tenorG4 public |
Read before you sign
Club deals with a lender’s discipline: how families should co-invest in a vessel or a project
Exit by design: building liquidity into single-asset investments in vessels and projects
The infrastructure gap: why family offices talk about real assets but hold almost none
How to grow a fleet without locking in capital at the wrong time
Which gap is holding your project back?
Tell us about the asset, the contracts and the timetable.