ICONIC Project Finance Advisory logo ICONIC
Project Finance Advisory

How much of an unlet data hall will a lender fund?

Rack of servers

In brief

  • The options: a colocation operator can build pre-let, part-let or speculatively. Lenders fund the let halls on contracted rent, and the rest only as they fill.
  • The market: vacancy in large US markets is at historic lows; Northern Virginia was below 1% in 2023 (McKinsey, 2024). But Bain sees the market turning “more disciplined, selective” (Bain, 2025).
  • The numbers: in ICONIC’s worked case of a 32 MW building, debt on let halls alone is about US$98m at 25% let and US$391m when full. Lending against unlet halls as merchant revenue, at a 50% haircut and a 2.0× cover, adds about US$95m at 25% let.

Chapter 1

Why do colocation operators build before they let?

Titman, Tompaidis and Tsyplakov (2005) show that the risk of a property’s income is priced into the spread of its loan.

Because colocation sells space by the rack, one customer at a time, and customers want capacity they can move into now. With vacancy below 1% in Northern Virginia in 2023 (McKinsey, 2024), building ahead has paid. It also leaves the operator with halls that earn nothing until they are let. Requirements are rising too: rack densities in Southeast Asia have risen from 8–12 kW to 25–40 kW (Turner & Townsend, 2026), so a hall built for yesterday’s density may need refitting.

Download the PDF

How does a lender treat capacity nobody has signed for?

Like merchant revenue. Titman, Tompaidis and Tsyplakov (2005) show that the risk of a property’s income is priced into the spread of its loan. Unlet space has no contracted income at all. A lender either ignores it or lends against it at a deep haircut and a high cover ratio. Smaller providers face a second gap: Norton Rose Fulbright notes they “may struggle to secure” power purchase agreements (Norton Rose Fulbright, 2025).

Topics to consider at this stage

  • How fast have the operator’s past halls let, and at what rent?
  • Are the halls built to a density customers will want in three years?

Like merchant revenue.

Key number

<1%

Northern Virginia vacancy, 2023. Source: McKinsey.

Inside the paper

How much of an unlet data hall will a lender fund?

DOC IPFA-INS-PF-PFT-2611-IPF-051-V2

Fill out the form to read the full paper.

PDF edition

Download the full Insight

Register below. We will ask you to confirm your e-mail address and then send you a personal download link.

Chapter 2

Framework: how much debt does each stage of letting support?

The framework compares three stages of letting on the same building.

The framework compares three stages of letting on the same building. The arithmetic is ICONIC’s.

Formula 1 (ICONIC): Debt = [Let rent ÷ DSCR(let) + Unlet rent × (1 − haircut) ÷ DSCR(unlet)] × [1 − (1 + r)^−n] ÷ r

Share letDebt on let halls onlyDebt with unlet halls as merchant
25%about US$98mabout US$193m
50%about US$196mabout US$259m
100%about US$391mabout US$391m
Exhibit 1. A four-hall, 32 MW colocation building. (ICONIC calculation: rent US$1.8m per MW a year when let; let rent at 1.30×; unlet rent at a 50% haircut and 2.0×; interest 7.5%; 15 years)

What it means for the operator. Unlet capacity is merchant revenue, and lenders size it like merchant revenue. Lending against it roughly doubles the debt at 25% let, but at a haircut and a cover a lender will accept only with a track record of letting. An earn-out, more debt released as halls are let, is the usual middle way.

Topics to consider at this stage

  • Does the loan release more debt as halls are let, and on what test?
  • What happens to cover if lease-up is a year late?
NumberWhy it matters
Share let at closeIt sets the contracted debt
Historic lease-up speedIt sets the earn-out
Haircut and cover on unlet rentIt sets what speculative space is worth to the lender
Density the halls are built forIt sets how lettable they stay
Exhibit 2. Four numbers before financing a colocation building.

Unlet capacity is merchant revenue, and lenders size it like merchant revenue.

Key number

US$98m / US$193m / US$391m

Debt at 25% let, with merchant, and full. Source: ICONIC calculation.

Chapter 3

What’s the bottom line?

An operator with a strong letting record can negotiate an earn-out and a smaller haircut.

A lender funds the let halls and lends against the rest only as they fill. An operator with a strong letting record can negotiate an earn-out and a smaller haircut. One without should expect to fund unlet halls with equity.

For the operator, this leads to three steps:

  1. Show the lender the letting record of past halls.
  2. Negotiate an earn-out that releases debt as halls are let.
  3. Build to the density customers will need, so the halls stay lettable.

A lender funds the let halls and lends against the rest only as they fill.

Key number

25–40 kW

Rack densities, from 8–12 kW. Source: Turner & Townsend.

How ICONIC can help

ICONIC Project Finance Advisory works with sponsors, owners and investors on the questions this Insight raises.

  • Data centre programmes. Lease-up modelling and earn-out structuring. Discuss your building.
  • Debt advisory. Lender approach for part-let assets. Pre-screen your financing.

Summary

Vacancy in large US markets has been at historic lows (McKinsey, 2024), but growth is turning more selective (Bain, 2025). Lenders price the risk of a property’s income (Titman, Tompaidis and Tsyplakov, 2005), and unlet space has none contracted. In ICONIC’s worked case, a 32 MW building supports about US$98m on let halls at 25% let, about US$193m if unlet halls are lent against as merchant revenue, and about US$391m when full.

Frequently asked questions

What is colocation?

A data centre that rents space, power and cooling to many customers, who bring their own servers.

What is an earn-out?

Debt that a lender commits at close but releases only when a test, such as a share let, is met.

References

  • Bain & Company (2025) Next phase of data center growth to be more disciplined… 22 October 2025.
  • McKinsey & Company (2024) How data centers and the energy sector can sate AI’s hunger for power.
  • Norton Rose Fulbright (2025) Driving sustainable data centres.
  • Titman, S., Tompaidis, S. and Tsyplakov, S. (2005) ‘Determinants of credit spreads in commercial mortgages’, Real Estate Economics, 33(4).
  • Turner & Townsend (2026) How AI is transforming Southeast Asia data centres.

This Insight is for general information only and does not constitute investment, legal or tax advice.

About this article

Authors

ICONIC Infrastructure TeamInfrastructure, ICONIC Project Finance Advisory

Approved by

Georgos S. AndrianopoulosCFO & Family Office Project Finance InvestmentProfessional EUR-ING by academic training and Chartered Financial Analyst, Georgos turned a long CFO career into international project, shipping and corporate finance. A motorsport enthusiast and car aficionado, he brings the same discipline to every transaction: precise set-up, rigorous modelling and timing at financial close, across maritime, infrastructure, oil and gas, renewables and PPPs. He tunes each transaction like a race car.Georgos S. AndrianopoulosProfessional EUR-ING by academic training and Chartered Financial Analyst, Georgos turned a long CFO career into international project, shipping and corporate finance. A motorsport enthusiast and car aficionado, he brings the same discipline to every transaction: precise set-up, rigorous modelling and timing at financial close, across maritime, infrastructure, oil and gas, renewables and PPPs. He tunes each transaction like a race car.