Chapter 1
How is green hydrogen supported?
Under the UK scheme (Norton Rose Fulbright, 2025):
Through price support. Under the UK Hydrogen Production Business Model, the producer receives the difference between a strike price and a reference price. The reference price is the higher of the price actually achieved and a floor linked to natural gas (Norton Rose Fulbright, 2025). The first allocation round awarded 11 projects totalling 125 MW (Norton Rose Fulbright, 2025). The support is needed: grey hydrogen from natural gas costs €1–2/kg (PwC), and green hydrogen costs much more. PwC expects green hydrogen costs to fall by about 50% by 2030. Glenk and Reichelstein (2019) show that the economics of converting renewable power to hydrogen depend on the price received and on how fully the electrolyser is used.
What does the support leave to the offtaker?
The volume. Under the UK scheme (Norton Rose Fulbright, 2025):
- the government counterparty does not buy hydrogen;
- the producer must sell it to a qualifying buyer, which excludes traders, exporters and injection into the gas grid;
- volume support applies only if sales fall below 50% of the reference volume, and only while some hydrogen is sold;
- the price discovery incentive passes the producer only 10% of any price above the floor;
- sales above 125% of reference volume in a year are not supported.
The subsidy sets the price; it does not buy the hydrogen.
Topics to consider at this stage
- Who will buy the hydrogen, for how long, and for what volume?
- Is the buyer a qualifying offtaker under the support scheme?
The subsidy sets the price; it does not buy the hydrogen.
Key number
50%
Inside the paper
A green hydrogen plant is only as bankable as its offtake contract
DOC IPFA-INS-PF-PFT-2611-IPF-052-V2
Fill out the form to read the full paper.
Download the PDFPDF edition
Download the full Insight
Register below. We will ask you to confirm your e-mail address and then send you a personal download link.
Chapter 2
Framework: what offtake term, price and volume does a lender need?
The framework sizes the debt under four offtake cases with the same 15-year support.
The framework sizes the debt under four offtake cases with the same 15-year support. The arithmetic is ICONIC’s.
Formula 1 (ICONIC): Debt = Σ over the periods of (CFADS in the period ÷ DSCR) × annuity factor, discounted to today
| Offtake case | Debt | Against full offtake |
|---|---|---|
| 15-year offtake for the full volume | about US$315m | — |
| 10-year offtake, then half the volume | about US$279m | −11% |
| 5-year offtake, then half the volume | about US$229m | −27% |
| Half the volume throughout | about US$158m | −50% |
What it means for the developer. Each year of offtake missing from the contract comes off the debt. Volume support below 50% protects the lender against a collapse, not against a plant selling half its output.
Topics to consider at this stage
- Does the offtake contract match the support’s term?
- What is the take-or-pay level, and does it cover debt service?
| Number | Why it matters |
|---|---|
| Offtake term against the support term | Each missing year comes off the debt |
| Take-or-pay volume | It sets the floor on CFADS |
| Buyer’s credit | It prices the debt |
| Debt at half the volume | It shows the downside the lender sizes on |
Each year of offtake missing from the contract comes off the debt.
Key number
US$315m / US$229m / US$158m
Chapter 3
What’s the bottom line?
The CfD protects the price; only a buyer protects the volume.
Green hydrogen financing is offtake financing. The CfD protects the price; only a buyer protects the volume. A developer who signs a long take-or-pay offtake with a creditworthy buyer before seeking debt raises the most from the same support.
For the developer, this leads to three steps:
- Match the offtake term to the support term.
- Negotiate a take-or-pay volume that covers debt service.
- Test the debt at half the volume, as the lender will.
Green hydrogen financing is offtake financing.
Key number
10%
How ICONIC can help
ICONIC Project Finance Advisory works with sponsors, owners and investors on the questions this Insight raises.
- Energy transition. Offtake structuring and debt sizing for hydrogen. Discuss your project.
- Project finance transactions. Support scheme and lender approach. Pre-screen your financing.
Summary
The UK supports green hydrogen with a 15-year CfD that pays only on sales to qualifying buyers. Volume support applies below 50% of forecast (Norton Rose Fulbright, 2025). Green hydrogen costs well above grey at €1–2/kg (PwC), and its economics depend on price and utilisation (Glenk and Reichelstein, 2019). In ICONIC’s worked case, a 100 MW plant supports about US$315m with a 15-year offtake and about US$158m if it sells only half its volume.
Frequently asked questions
What is a contract for difference?
A contract that pays the producer the difference between an agreed strike price and a market or reference price, and recovers it when the market price is higher.
What is a qualifying offtaker?
Under the UK scheme, a buyer that uses the hydrogen itself rather than trading, exporting or injecting it into the gas grid.
References
- Glenk, G. and Reichelstein, S. (2019) ‘Economics of converting renewable power to hydrogen’, Nature Energy, 4.
- Norton Rose Fulbright (2025) UK Hydrogen Guide 2025. March 2025.
- PwC (n.d.) Analysing the future cost of green hydrogen.
This Insight is for general information only and does not constitute investment, legal or tax advice.