How do lenders fund an oil field before the first barrel flows?

Offshore oil rig in calm water

In brief

  • Situation. A reserve-based loan (RBL) lends against producing reserves, valued at the lenders’ price deck.
  • Complication. A field in development has no production, so its borrowing base is close to zero until first oil. Bain notes that low prices led the industry to defer or cancel US$200bn of planned investment in two years, and that US$1.5tn more “may be uneconomic” (Bain).
  • Question and answer. What stands in for producing reserves? A development facility with a completion test, a prepayment from a buyer, or sponsor support. In ICONIC’s worked case, a 40m-barrel field supports about US$545m of RBL debt once it produces at US$70, and none before.

Chapter 1

What does a reserve-based loan lend against?

Large upstream projects carry that risk at scale.

Against barrels that flow. The lenders value proved developed producing (PDP) reserves at their own price deck, discount the cash flow and lend a share of that value: the borrowing base.

Download the PDF

Why does a field in development fall outside it?

Because it has no production. Its reserves are proved but undeveloped, and the lender would be taking completion risk on a reservoir and a facility not yet built. Large upstream projects carry that risk at scale. Bain cites an Arctic offshore facility budgeted at more than US$3bn. It notes that 80–90% of costs are incurred in the later phases, while the decisions that set them are made early (Bain). Investment itself responds to uncertainty: Kellogg (2014) shows that Texas oil drilling falls when expected price volatility rises.

Topics to consider at this stage

  • How much of the field’s value is in producing reserves at first oil?
  • Who carries the risk that first oil is late or production is lower?

Against barrels that flow.

Key number

0

Borrowing base before first oil.

Inside the paper

How do lenders fund an oil field before the first barrel flows?

DOC IPFA-INS-PF-PFT-2611-IPF-047-V2

Fill out the form to read the full paper.

PDF edition

Download the full Insight

Register below. We will ask you to confirm your e-mail address and then send you a personal download link.

Chapter 2

Test 1. What does the borrowing base give after first oil?

The field’s debt capacity appears on the day it produces, and a 25% cut in the price deck takes away more than four-tenths of it.

The framework compares the debt a field can raise before and after first oil, and what can fill the gap. The arithmetic is ICONIC’s.

Formula 1 (ICONIC): Borrowing base = Advance rate × PV10 of PDP net cash flow at the bank price deck

Price deckPV10 of PDPBorrowing base before first oilBorrowing base after first oil
US$70about US$1.09bn0about US$545m
US$52.5 (−25%)about US$614m0about US$307m
Exhibit 1. A 40m-barrel field before and after first oil. (ICONIC calculation: production from 6m barrels a year, declining; operating cost and royalty US$30 a barrel; 10% discount; advance rate 50%)

What it means for the producer. The field’s debt capacity appears on the day it produces, and a 25% cut in the price deck takes away more than four-tenths of it. Before first oil, something else must carry the development.

Key number

US$545m / US$307m

Borrowing base at US$70 / US$52.5. Source: ICONIC calculation.

Chapter 3

Test 2. What can stand in for producing reserves?

The cheapest is usually the party best able to judge it: the sponsor for the reservoir, the buyer for the market.

BridgeWho carries completion riskCost
Development facility with a completion test, converting to an RBLLenders, with sponsor support until completionHigher margin; sponsor guarantee
Prepayment from a buyer, repaid in barrelsThe buyerA discount on the barrels
Sponsor equity or a corporate loanThe sponsorThe sponsor’s cost of capital
Exhibit 2. Three ways to fund development before first oil.

What it means for the producer. Each bridge moves completion risk to someone. The cheapest is usually the party best able to judge it: the sponsor for the reservoir, the buyer for the market.

Topics to consider at this stage

  • What is the completion test, and who sets it?
  • What happens to the borrowing base at the first redetermination after first oil?

Each bridge moves completion risk to someone.

Key number

US$200bn

Investment deferred or cancelled. Source: Bain.

Chapter 4

Framework: what can stand in for producing reserves?

The framework compares the debt a field can raise before and after first oil, and what can fill the gap.

NumberWhy it matters
Borrowing base at first oilThe debt the field can carry once it produces
Borrowing base after a 25% price cutIts sensitivity
Cost to first oil, with contingencyWhat the bridge must fund
Completion date and testWhen the bridge converts
Exhibit 3. Four numbers before financing a development.

Chapter 5

What’s the bottom line?

The RBL arrives with production; until then, the producer must choose between lender, buyer and sponsor, and pay for the risk each takes.

A field is financed before first oil by whoever carries the completion risk. The RBL arrives with production; until then, the producer must choose between lender, buyer and sponsor, and pay for the risk each takes.

For the producer, this leads to three steps:

  1. Compute the borrowing base at first oil on the bank price deck, and after a 25% cut.
  2. Decide who carries completion risk, and price each bridge.
  3. Agree the completion test and the conversion to an RBL before drawing.

A field is financed before first oil by whoever carries the completion risk.

How ICONIC can help

ICONIC Project Finance Advisory works with sponsors, owners and investors on the questions this Insight raises.

  • Energy (upstream). Field development financing, from bridge to RBL. Discuss your field.
  • Project finance transactions. Lender approach and completion tests. Pre-screen your financing.

Summary

An RBL lends against producing reserves, and a field in development has none. Upstream projects are large and cost is set early (Bain), and drilling responds to price uncertainty (Kellogg, 2014). In ICONIC’s worked case, a 40m-barrel field supports about US$545m of RBL debt at US$70 once it produces, about US$307m after a 25% price cut, and nothing before first oil.

Frequently asked questions

What is first oil?

The first commercial production from a field.

What is a prepayment?

An advance from a buyer, repaid with future production rather than cash.

References

  • Bain & Company (n.d.) Capital productivity for oil and gas in a low-price environment.
  • Bain & Company (n.d.) Large project management in oil and gas. Bain Brief.
  • Kellogg, R. (2014) ‘The effect of uncertainty on investment: evidence from Texas oil drilling’, American Economic Review, 104(6).

This Insight is for general information only and does not constitute investment, legal or tax advice.

About this article

Authors

ICONIC Energy TeamEnergy, ICONIC Project Finance AdvisoryPower bought from a plant not yet built is a promise in steel and cable. We test every link between the panels and the buyer before you sign: the PPA, the grid, curtailment and the financing.ICONIC Energy TeamPower bought from a plant not yet built is a promise in steel and cable. We test every link between the panels and the buyer before you sign: the PPA, the grid, curtailment and the financing.

Approved by

Georgos S. AndrianopoulosCFO & Family Office Project Finance InvestmentProfessional EUR-ING by academic training and Chartered Financial Analyst, Georgos turned a long CFO career into international project, shipping and corporate finance. A motorsport enthusiast and car aficionado, he brings the same discipline to every transaction: precise set-up, rigorous modelling and timing at financial close, across maritime, infrastructure, oil and gas, renewables and PPPs. He tunes each transaction like a race car.Georgos S. AndrianopoulosProfessional EUR-ING by academic training and Chartered Financial Analyst, Georgos turned a long CFO career into international project, shipping and corporate finance. A motorsport enthusiast and car aficionado, he brings the same discipline to every transaction: precise set-up, rigorous modelling and timing at financial close, across maritime, infrastructure, oil and gas, renewables and PPPs. He tunes each transaction like a race car.